我们集团组织了 3000 多个全球系列会议 每年在美国、欧洲和美国举办的活动亚洲得到 1000 多个科学协会的支持 并出版了 700+ 开放获取期刊包含超过50000名知名人士、知名科学家担任编委会成员。

开放获取期刊获得更多读者和引用
700 种期刊 15,000,000 名读者 每份期刊 获得 25,000 多名读者

抽象的

Capturing Uncertainty for New Field Development Plan Influenced by Pressure Depletion

Mohd Fairuz Azman

Dealing with subsurface uncertainties in formulating a new field development plan will always a challenge especially with the absence of data. This paper will discuss on subsurface approach in integrating limited reservoir and appraisal wells data with nearby field performance and regional geological understanding to address the pressure depletion uncertainty observed in the field despite no production. This paper demonstrates a structured workflow from reservoir pressure calibration in the dynamic model during initialization up to multiple prediction runs for depletion strategy evaluation. It started with in-depth analysis of available data recorded from exploration/appraisal wells and nearby field performance. Then, a tank model was built to predict baseline pressure depletion trend by establishing pressure communication with nearby field. The forecasted pressure depletion was then transferred into dynamic model, in which pseudo-water producers were introduced to calibrate the reservoir pressure, and subsequently generate range of possible reservoir pressure depletion trends. This variable were then captured in Uncertainty Analysis workflow and followed by probabilistic production forecast.

免责声明: 此摘要通过人工智能工具翻译,尚未经过审核或验证。